Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13604572

- Product Categories
- Friendly Links
Information Name: | Trough cable tray | Zhuhai cable tray | cable bridge leading manufacturers Chai Jin |
Published: | 2015-04-30 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | [Chai Jin cable tray to recommend the star product - the bridge] in the room, as far as possible to set up along the walls, columns, beams and floor of the building, such as Xu take advantage of a comprehensive pipe gallery set up, should be in the side or top of the parallel pipeline erection cable tray and consider deflectors and branch lines to avoid the cross, as no other pipe racks to borrow, you need inception (branch) column. (2) Load Calculation: trunk cable bridge profile weight per unit length of the cable. [Chai Jin cable tray to recommend the star product - bridge 2, such as the power cable tray combination, should power cables and electronic cables between each straight side of the cable tray how to sell, in the middle separated by diaphragms. 3, weak cable in combination with other low-voltage cable bridge, should be strictly enforced select an outer shield weak system of weak cable, to avoid mutual interference. [Chai Jin cable tray to recommend the star product - bridge] If the different levels of cable laid in the same cable tray cable tray installation, intermediate bulkhead should be increased isolation. 1.8 When the steel straight sections longer than 30m, when aluminum cable bridge over 15m. Or when should retractable cable tray after building (settlement) seam allowance leaving O-30mm compensation. Its retractable connector plate connection should be used. 1.9 cable ladder, tray width and height should be chosen to meet the requirements of the filling factor of the cable in the ladder, tray filling rate in general, the power cables desirable 40% -50%, 50% of the control cable is preferable. 70%. L0% and should set aside a 252 project development margin. 1.10 When choosing cable tray load rating if the actual span cable tray hangers is not equal to 2m time. The work uniform loads should be met: where qG ---- work uniform load cable tray, kN / m; qE ---- rated uniform load, kN / m; LG ---- actual span, m . Rated bridge uniform load rating Table 1. Trough cable tray | Zhuhai cable tray | cable trays known manufacturers Chai Jin Chai Jin from the Tianjin cable bridge Limited. Chai Jin Tianjin Cable Bridge Co., Ltd. (www.tjcjdlqj.com) strong, credible, in Tianjin metals and building materials industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Chai Jin cable tray and you hand into the brilliant, for a better future! |
Admin>>>
You are the 31324 visitor
Copyright © GuangDong ICP No. 10089450, Chai Jin cable tray, Ltd. Tianjin All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 31324 visitor
Copyright © GuangDong ICP No. 10089450, Chai Jin cable tray, Ltd. Tianjin All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility