Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13604572

- Product Categories
- Friendly Links
Information Name: | Ladder bridge parts, Yuxi ladder tray, cable tray famous enterprises Chai Jin |
Published: | 2015-04-13 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | [Chai Jin cable tray to recommend the star product - the bridge] 1.5 EMI shielding required cabling. Or when an external protection such as outdoor sunlight to shadow n oil ladder bridge, corrosive liquids, combustible dust and other environmental requirements. Should be used without holes tray cable bridge. 1.6 In places easily accumulate dust ladder bridge Which is good, cable tray cover should be used; in public access across the road segment or outdoor. Should increase the use of non-porous plate or tray on the bottom of the bridge. [Chai Jin cable tray to recommend the star product - Bridge] If the different levels of cable laying in the same cable tray, the middle partition should be increased isolation. 1.8 When the steel line segment length exceeds 30m, while aluminum cable bridge over 15m. Or when the cable tray after construction should stretch (settlement) seam allowance leaving O-30mm compensation. Its retractable connector plate connection should be used. 1.9 cable ladder, tray width and height should be chosen to meet the requirements of the filling factor ladder bridge parts, cables under ladders, trays fill rate within the general how to sell ladder bridge, power cables desirable 40% - 50%, 50% preferred the control cables. 70%. L0% and should be reserved for a 252 project development margin. 1.10 In selecting cable tray load rating if the actual span cable tray hanger is not equal to 2m when. The work uniform load should be met: where qG ---- Work uniform load, kN / m; qE ---- rated uniformly distributed load, kN / m; LG ---- actual span, m. Rated bridge uniform load rating in Table 1. [Chai Jin cable tray to recommend the star product - bridge] at 1KV and below neutral grounding system, grounding neutral grounding powered devices connected to the system. Air-powered equipment is automatically turned off at Villa, the long direction of the metal bridge level cross-sectional area shall not be less than the specified value. 3, along the full length of the bridge lay another ground lines, each (including non-linear segment) should be at least a little bridge a reliable connection with the grounding line. 4, for vibration place, at the junction of the ground portion of the coil should be installed. Ladder bridge parts, Yuxi ladder bridge, known enterprises Chai Jin Chai Jin cable tray cable tray provided by the Tianjin Limited. Chai Jin Tianjin cable bridge Limited (www.tjcjdlqj.com) strong, credible, in Tianjin metal building materials industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Chai Jin cable tray and you hand into the brilliant, for a better future! |
Admin>>>
You are the 31324 visitor
Copyright © GuangDong ICP No. 10089450, Chai Jin cable tray, Ltd. Tianjin All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 31324 visitor
Copyright © GuangDong ICP No. 10089450, Chai Jin cable tray, Ltd. Tianjin All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility